Vaisala WMS302 Podręcznik Użytkownika Strona 101

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 100
Chapter 5 ________________________________________________________________ Operation
VAISALA_______________________________________________________________________ 99
9902-002
Figure 87 Aligning MAWS201 on the Northern
Hemisphere
3. Check with the bubble level (number 1 in Figure 88 on page 99)
that the station is leveled. The air bubble must be inside the circle.
Adjust the legs to level the station.
0403-009
Figure 88 Leveling the Station
4. To adjust the length of the legs, loosen the hand screw (number 1
in Figure 89 on page 100) at the lower end of the leg. Extend the
leg and lock by tightening the hand screw. After you have aligned
the station, insert a peg through the hole (2) to the ground to secure
Przeglądanie stron 100
1 2 ... 96 97 98 99 100 101 102 103 104 105 106 ... 261 262

Komentarze do niniejszej Instrukcji

Brak uwag