Vaisala DRYCAP DMT345 Podręcznik Użytkownika Strona 41

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 185
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 40
Chapter 3 ________________________________________________________________ Installation
VAISALA ________________________________________________________________________ 41
Cable Grounding
Ground the screen of the electrical cable properly to achieve the best
possible EMC performance.
0605-027
Figure 25 Grounding the Screen of Electrical Cable
Refer to Figure 25 above when performing the procedure below.
1. Cut back outer sheath to desired length.
2. Cut back screen braiding or screen foil to dimension X.
3. Push the domed cap nut (item 1) and the seal insert with contact
socket of the gland (items 2 & 3) onto the cable as shown in the
diagram.
4. Bend over the screen braiding or screen foil by about 90º (item 4).
5. Push the seal insert with the contact socket of the gland
(items 2 & 3) up to the screen braiding or screen foil.
6. Mount the lower part (item 5) on the housing.
7. Push the seal with the contact socket of the gland (item 2 & 3) into
the lower part (item 5).
8. Install the domed cap nut (item 1) onto the lower part (item 5).
Przeglądanie stron 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 184 185

Komentarze do niniejszej Instrukcji

Brak uwag